Malarkey shingles, installed / File 02
A Discontinued Shingle Line Needs a Named Fallback in the Spec
A repair years from now needs a match, so name the product, the color and a fallback in the spec before the order ships.
Shingle lines change. A manufacturer retires a profile, renames a color, or moves a line to a different mat, and the bundle that matched your roof when it went on may not be sold anymore when a storm takes off a row of shingles years later. At Keys Roofing we install Atlas and Malarkey shingles only, so the question on this page is narrow: what should your spec say now so that a future repair has a fair chance of matching, and what happens to the price when it does not?
Material and spec
Start with the name as printed. Write the full product name exactly as the wrapper shows it, not a shortened nickname from a sales call. A spec that says "architectural shingle, charcoal" cannot be searched for again. Add the profile (dimensional or three-tab), the color name as the wrapper prints it, and the bundle lot from the delivery. The lot helps trace a box, but the product and color are what a supplier searches for when a repair order comes in.
Next, record the color as a name and as a picture. Color names drift between sample boards, websites and bundle labels, so ask the crew to photograph the installed field in daylight with a wrapper next to it. That photo is the reference a supplier can compare against years later, and it is the only practical way to tell two similar grays apart once the sun has worked on them.
Write the date on the spec too. A spec written in October describes the line as it was sold that month, and a supplier who receives the request five years later needs that date to know what to look for. Attach the wrapper photo to the same record so the date, the name and the color travel together.
Then write the fallback. A fallback is a named product that the homeowner has agreed can stand in for the original if the original is no longer made. "A similar shingle" is not a fallback. The spec should name the manufacturer, the product, the profile and the color family that would be offered, and it should say who decides whether the fallback is acceptable at the time of repair. Keys installs Atlas and Malarkey only, so a fallback written into a Keys spec stays inside those two manufacturers. A fallback from a third brand would put a different shingle on the same slope, and the seam between the two products would show in the first summer.
Check the fallback against the existing roof before it goes into the spec. Compare the tab width or the butt shape, the exposure and the headlap. Shingles from the same manufacturer and profile can still differ in exposure or in the size of the cutouts, so a repair with a close cousin can leave a visible line even when the color looks right. The fallback should be a product you can lay next to the old shingle, not one you hope lines up.
Missouri has no matching statute for roofs. Whether a repair has to match the rest of the roof turns on the wording of the homeowner's policy, not on a state rule. That is one more reason to write the fallback into the spec. The spec is the document that shows what was agreed at the time, and it is much harder to reconstruct from memory once the crew has left and the original product is gone.
What it costs
A fallback line in the spec does not add cost by itself. What adds cost is a repair that cannot be matched, because the next step is often a larger job than the repair itself. If the closest current product sits in a different price tier from the original, or uses a different bundle count per square, the repair estimate changes. Ask for that difference before the job starts, not after the order is placed.
A sample is a small cost and worth paying for. Ask whether the quote includes pulling a sample of the existing shingle when the roof is torn off, and whether the homeowner keeps it. Store the sample in a dry place, labeled with the address and the date. A kept sample costs very little, while a repair that has to be guessed can end up costing a full slope.
Read the waste line too. A repair order usually needs a few extra shingles for cuts and for a second attempt at the color match, and the quote should state how many. Ask for that number in writing, along with the price per bundle that applies if the repair is ordered separately from the original job.
Finally, ask whether the quote is priced on the named product or on a category. A quote that says "standard architectural shingle" will be priced on whatever the supplier has in stock, which may not be the product the spec names. A quote that names the product is priced on that product, and any change to it has to go through the change order clause in the contract.
What to ask
Bring these questions to each roofer and write the answers down:
- Is this exact product still in production, and where is its current spec sheet?
- If it is not, what is the closest current product from the same manufacturer, with the same profile and exposure?
- Will the product name, color name and bundle lot go into the contract and the photo file?
- Who pulls the sample from the old roof, and where will it be stored?
- Who decides whether a fallback is acceptable at repair time, and in what written form is that decision recorded?
- How many extra shingles does the repair order assume for cuts and matching, and what does a bundle cost if it is ordered separately?
- How is stock checked, and when will the roofer confirm availability before the crew is scheduled?
A roofer who answers the first question with a product name and a date is giving you something you can check. One who says they can always find something is describing a repair that has not been planned. If you want these fields filled in writing before you sign, call Keys Roofing at (314) 220-2333.